国产精品日产欧美久久久,真实的和子乱拍在线观看,亚洲精品无码久久久,国产深夜男女无套内射

400-0302-595
首頁(yè) > Industry hotspots
Case | Shaoxing Converter Station: Starting Annual Maintenance of the "West East Power Transmission
Time:2022-04-13 14:16:16Source:Anlpsorder

Recently, the Shaoxing converter station completed its 6th annual comprehensive maintenance, laying a solid foundation for ensuring power supply during this summer's peak electricity consumption period in Zhejiang and the Hangzhou Asian Games.

Zhejiang is a province with high energy consumption and low resources, and foreign electricity accounts for more than one-third of the highest load in the province. Adding to the key tasks of ensuring electricity supply during the Hangzhou Asian Games and summer peak season, the task of ensuring electricity supply in Zhejiang this summer has become even more challenging. In this annual maintenance, State Grid Zhejiang Ultra High Voltage Company, based on daily operation and maintenance experience and anti accident measures investigation, carried out maintenance on new equipment such as converter transformer lifting seats installed in Shaoxing converter station in recent years. The operation and maintenance personnel of State Grid Zhejiang Ultra High Voltage Company have installed 70 visible light cameras in the DC field and AC filter field, and connected them to the panoramic video fusion system of the converter station to improve the information perception ability of the system. The panoramic video fusion system initially has four functions: self perception and digital expression, equipment status analysis and diagnosis, accident response, and intelligent control, which can help improve the efficiency of operation and inspection.

The Shaoxing converter station is a ± 800 kV Lingshao DC receiving end converter station, which was put into operation in August 2016. The project starts from Lingzhou Converter Station in Yinchuan, Ningxia, passes through 6 provinces (regions), and ends at Shaoxing Converter Station in Zhuji, Zhejiang. The total length of the line is 1720 kilometers. As the main artery of the "West East Power Transmission", the Lingshao DC project has maintained stable operation with a large load of 7200 megawatts for a long time, continuously sending wind and solar power from thousands of miles away from the Ningxia energy base to Zhejiang, with a maximum daily power transmission of 160 million kilowatt hours, making the vision of "coal flowing from the air and electricity coming from afar" a reality.

As one of the first pilot projects for digital converter stations in China, State Grid Zhejiang Electric Power has applied new technologies such as the Internet of Things, artificial intelligence, 3D modeling, and Beidou positioning at the Shaoxing converter station, integrating automated collection of equipment monitoring data to achieve remote intelligent inspection of equipment, centralized monitoring of data, and automatic push of fault handling strategies. The application of new technologies has enhanced the ability of operation and inspection personnel to control equipment, ensuring the long-term safe and stable operation of the converter station.

安貝斯

Based on the concept of the "West East Power Transmission" main artery of Shaoxing converter station, and in combination with the analysis of the informationization status required by the control center, Ambes participated in the construction of the main control room, laying a solid foundation for the informationization construction of the command center, promoting the later development to break through institutional and mechanistic bottlenecks, improving the policy support system for expanding domestic demand, and substantially implementing the expansion of domestic demand. On the LED screen in the main control room, the digital converter station panoramic video fusion system is running. The system can display visible light images of the entire station equipment in a single image, synchronously displaying operating condition information such as infrared temperature measurement data of the converter transformer square, DC field, and converter valve.

Due to the shift in annual inspection time, after the completion of this maintenance work, the project will face the test of long-term operation conditions of "one and a half years" for the first time. Digitization will provide important impetus for the continuous operation of the Lingshao DC project.

Recommend

安貝斯_穎兒

027-86578008

在線咨詢

CAOPORN成人免费公开| 国产精品人妻一区二区三区四区| 亚洲AV中文无码乱人伦在线播放| 色情久久久av熟女人妻网站 | 国产乱妇乱子在线播视频播放网站| 强行无套内谢大学生初次| 网站你懂得| 狠狠色噜噜狠狠亚洲AV| 亚洲日韩激情无码一区| 国产亲妺妺乱的性视频| 极大满足求知欲的视频| 国产精品成人久久久久久久| 无码精品人妻一区二区三区APP| 中国成熟妇女毛茸茸| 奇米网777四色首页| 国产精品久久毛片| 97久久精品亚洲中文字幕无码| 日本黄a级a片国产免费| 公的下面好大弄得我好爽| 亚洲日韩国产AV无码无码精品| 一本一本久久A久久综合精品蜜桃| 揉她小豆豆揉到失禁h| 日本一区二区三区| 人妻熟女一二三区夜夜爱| 99久久久国产精品免费| 人妻人人澡人人添人人爽人人玩 | 亚洲 暴爽 AV人人爽日日碰| 重口老太大和小伙乱| 一面亲上边一面膜下边| 免费漫画网站| 级毛片内射视频| 久久精品国产亚洲AV无码偷窥| 精品一区二区三区在线成人| 乱人伦XXXX国语对白| 成人午夜性A级毛片免费| 国产人与禽zoz0性伦| 天天夜夜草草久久伊人69堂| 免费视频网站在线看视频| 久久av色欲av久久蜜桃麻豆| 亚洲春色av无码专区456| 精品无码人妻一区二区免费蜜桃|