Case | Shaoxing Converter Station: Starting Annual Maintenance of the "West East Power Transmission
Time:2022-04-13 14:16:16Source:Anlpsorder

Recently, the Shaoxing converter station completed its 6th annual comprehensive maintenance, laying a solid foundation for ensuring power supply during this summer's peak electricity consumption period in Zhejiang and the Hangzhou Asian Games.

Zhejiang is a province with high energy consumption and low resources, and foreign electricity accounts for more than one-third of the highest load in the province. Adding to the key tasks of ensuring electricity supply during the Hangzhou Asian Games and summer peak season, the task of ensuring electricity supply in Zhejiang this summer has become even more challenging. In this annual maintenance, State Grid Zhejiang Ultra High Voltage Company, based on daily operation and maintenance experience and anti accident measures investigation, carried out maintenance on new equipment such as converter transformer lifting seats installed in Shaoxing converter station in recent years. The operation and maintenance personnel of State Grid Zhejiang Ultra High Voltage Company have installed 70 visible light cameras in the DC field and AC filter field, and connected them to the panoramic video fusion system of the converter station to improve the information perception ability of the system. The panoramic video fusion system initially has four functions: self perception and digital expression, equipment status analysis and diagnosis, accident response, and intelligent control, which can help improve the efficiency of operation and inspection.

The Shaoxing converter station is a ± 800 kV Lingshao DC receiving end converter station, which was put into operation in August 2016. The project starts from Lingzhou Converter Station in Yinchuan, Ningxia, passes through 6 provinces (regions), and ends at Shaoxing Converter Station in Zhuji, Zhejiang. The total length of the line is 1720 kilometers. As the main artery of the "West East Power Transmission", the Lingshao DC project has maintained stable operation with a large load of 7200 megawatts for a long time, continuously sending wind and solar power from thousands of miles away from the Ningxia energy base to Zhejiang, with a maximum daily power transmission of 160 million kilowatt hours, making the vision of "coal flowing from the air and electricity coming from afar" a reality.

As one of the first pilot projects for digital converter stations in China, State Grid Zhejiang Electric Power has applied new technologies such as the Internet of Things, artificial intelligence, 3D modeling, and Beidou positioning at the Shaoxing converter station, integrating automated collection of equipment monitoring data to achieve remote intelligent inspection of equipment, centralized monitoring of data, and automatic push of fault handling strategies. The application of new technologies has enhanced the ability of operation and inspection personnel to control equipment, ensuring the long-term safe and stable operation of the converter station.

安貝斯

Based on the concept of the "West East Power Transmission" main artery of Shaoxing converter station, and in combination with the analysis of the informationization status required by the control center, Ambes participated in the construction of the main control room, laying a solid foundation for the informationization construction of the command center, promoting the later development to break through institutional and mechanistic bottlenecks, improving the policy support system for expanding domestic demand, and substantially implementing the expansion of domestic demand. On the LED screen in the main control room, the digital converter station panoramic video fusion system is running. The system can display visible light images of the entire station equipment in a single image, synchronously displaying operating condition information such as infrared temperature measurement data of the converter transformer square, DC field, and converter valve.

Due to the shift in annual inspection time, after the completion of this maintenance work, the project will face the test of long-term operation conditions of "one and a half years" for the first time. Digitization will provide important impetus for the continuous operation of the Lingshao DC project.

Recommend

安貝斯_穎兒

027-86578008

在線咨詢

男人又粗又大又猛又硬| 岳的大肥坹毛茸茸| 亚洲AV无码一区二区三区在线高 | 内射人妻无码色AV无码| 国模无码一区二区三区不卡| 88国产精品欧美一区二区三区| 丁香花在线视频观看免费| 波多野结衣人妻| 日本免费一区二区三区视频观看| 欧美性大战久久久久久久| 99久久综合精品五月天| 男女多p混交群体交乱a片小说| 军人的粗大h拔不出来| 偷窥50个美女撒尿高清| 99无码精品二区在线视频| 中文字幕AV伊人AV无码AV| 夜夜躁天天躁很躁| cao死你好紧好爽好湿视频男男| 一本大道久久香蕉成人网| 亚洲AV中文无码乱人伦| 日本乱偷中文字幕| 久久桃花综合桃花七七网| 欧美性狂猛XXXXXBBBBB| 精品人妻系列无码人妻免费视频 | 国产又粗又猛又爽又黄| 波多野结衣52部合集在线观看| 精品无码人妻一区二区三区| 色又黄又爽18禁免费网站现观看| AV无码天堂一区二区三区| 天天做天天爱天天爽综合网| 强行扒开双腿猛烈进入免费版| 欢乐颂3电视剧全集免费观看| 377人体粉嫩噜噜噜| 久久精品无码一区二区三区免费| 日本不卡一区二区三区| 高潮捣出白浆嗯啊哭叫h漫画| 大秦赋全集1-78集免费观看| 最近中文字幕在线MV视频7| 亚洲熟妇色XXXXX欧美老妇Y| 亚洲人成在线观看| 国产激情精品一区二区三区|